06 Nov 2025 / Khalifa Port, United Arab Emirates

Marine construction and dredging works

AD Ports Group has announced that marine construction and dredging activities are being conducted in the open seaside area located North of Khalifa Port basin and the area adjacent to main channel, from today (6 November) until further notice.

In its Notice To Mariners No.14/2025, AD Ports Group advises that dredged materials will be discharged to a designated area, using floating & submerged pipelines within the No Go Area bounded by the following coordinates:
1) 24° 49' 27.42" N / 054° 37' 37.42" E
2) 24° 50' 41.26" N / 054° 39' 15.93" E
3) 24° 51' 00.92" N / 054° 39' 00.03" E
4) 24° 51' 08.81" N / 054° 39' 11.21" E
5) 24° 50' 42.75" N / 054° 39' 33.93" E
6) 24° 50' 22.48" N / 054° 39' 29.04" E
7) 24° 49' 54.65" N / 054° 38' 52.37" E
8) 24° 49' 20.80" N / 054° 39' 22.93" E
9) 24° 48' 36.26" N / 054° 38' 23.60" E

Two temporary yellow special marker buoys and silt curtain will be deployed, at the following positions and with the below characteristics:

B1
- Yellow Marker Buoy
- Light Characteristics: Yellow Fl(1) 10s
- Coordinates: 24° 49' 11.89" N / 054° 37' 52.22" E

B2
- Yellow Marker Buoy
- Light Characteristics: Yellow Fl(1) 10s
- Coordinates: 24° 48' 58.94" N / 054° 38' 02.98" E

Mariners are advised to temporarily update the related BA charts [Admiralty chart number BA 3752 and adjoining charts].

No vessels other than those engaged in the project works shall enter the navigation exclusion zone.

All vessels & boats using the port must navigate with heightened caution in the vicinity of operation & dredging area.

For information about operations in Abu Dhabi, contact GAC Abu Dhabi at [email protected]

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.

Make an
enquiry

enquiry icon

Find your
country

country icon