05 May 2016 / Hong Kong

Maintenance Dredging at Pun Shan Shek Anchorage

For approximately 7 months, dredging operations will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS84 Datum) from (A) to (H):
(A) 22 deg. 19.310’N / 114 deg. 04.503’E
(B) 22 deg. 18.990’N / 114 deg. 04.635’E
(C) 22 deg. 18.927’N / 114 deg. 04.224’E
(D) 22 deg. 19.022’N / 114 deg. 04.185’E
(E) 22 deg. 19.041’N / 114 deg. 04.240’E
(F) 22 deg. 19.143’N / 114 deg. 04.198’E
(G) 22 deg. 19.201’N / 114 deg. 04.361’E
(H) 22 deg. 19.251’N / 114 deg. 04.340’E

The works will be carried out by one grab dredger. Three split hopper barges, three tugs and two guard boats will provide assistance. The number of vessels engaged in the works will change from time to time to suit operational requirements.

A working area of approximately 50 metres around the grab dredger will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the dredger.

The hours of work will be round-the-clock.

Vessels engaged in the operations will display signals as prescribed in international and local regulations.

Vessels navigating in the vicinity should proceed with caution.

(For information about operations in Hong Kong contact GAC Hong Kong at [email protected])

Source: Government of Hong Kong SAR Marine Department Notice No.53 of 2016 dated 4 May 2016

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.

Make an
enquiry

enquiry icon

Find your
country

country icon