31 Jul 2015 / Singapore, Singapore

Maintenance at Exxon Mobil Berth 4

From 11 December 2014 to 16 February 2015, maintenance work will be carried out at the Exxon Mobil Berth 4. According to the Maritime and Port Authority of Singapore Port Marine Notice No. 156 of 2014, the works will be conducted between 0700 and 1900 hours, from Monday to Saturday, within the working area bounded by the following co-ordinates (WGS 84 Datum): A) 01 deg. 17.903'N / 103 deg. 41.423'E B) 01 deg. 17.907'N / 103 deg. 41.448'E C) 01 deg. 17.890'N / 103 deg. 41.450'E D) 01 deg. 17.887'N / 103 deg. 41.425'E Work will involve rebar and formwork followed by concrete grouting. Craft involved in the works will exhibit the appropriate local and international day and night signals. When in the vicinity of the working area, mariners are reminded to: a) Keep well clear and not to enter the working area; b) Maintain a proper lookout; c) Proceed at a safe speed and navigate with caution; d) Maintain a listening watch on VHF Channel 22 (Jurong Control); and e) Communicate with Jurong Control on VHF Channel 22 for assistance, if required. For information about operations in Singapore contact GAC Singapore at [email protected]

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.

Make an
enquiry

enquiry icon

Find your
country

country icon