31 Jul 2015 / Singapore, Jurong Port
From 24 December 2014 to 31 January 2015, work to install piles near Exxonmobil Berth 7, Jurong Island, will be carried out. According to the Maritime and Port Authority of Singapore Port Marine Notice No.164 of 2014, the work will be conducted 24 hours daily - including Sundays & Public Holidays - within the working areas bounded by the following coordinates (WGS 84 Datum): 1) 01�� 17.462'N / 103�� 41.125'E 2) 01�� 17.462'N / 103�� 41.182'E 3) 01�� 17.445'N / 103�� 41.182'E 4) 01�� 17.445'N / 103�� 41.125'E A crane barge assisted by tug boats will be used to install the piles and staging. Craft involved in the works will exhibit the appropriate local and international day and night signals. When in the vicinity of the working area, mariners are reminded to: a) Keep well clear and not to enter the working area; b) Maintain a proper lookout; c) Proceed at a safe speed and navigate with caution; d) Maintain a listening watch on VHF Channel 22 (Jurong Control); and e) Communicate with Jurong Control on VHF Channel 22 for assistance, if required. For information about operations in Singapore contact GAC Singapore at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.