30 Aug 2019 / Singapore
The working period for the installation of a floating sea barrier off Changi East has been extended. The work will now be carried out from 1 September 2019 to 29 February 2020.
According to the Maritime and Port Authority of Singapore Port Marine Notice No.080, the work will be conducted 24 hours daily - including Sundays & Public Holidays - within the working area bounded by the following co-ordinates (WGS 84 Datum):
1) 1 deg. 18.618'N / 103 deg. 59.844'E
2) 1 deg. 18.611'N / 103 deg. 59.863'E
3) 1 deg. 18.661'N / 103 deg. 59.884'E
4) 1 deg. 18.668'N / 103 deg. 59.867'E
Installation of floating sea barrier will be carried out using crane and work barges. These barges will be assisted by tugs. Safety boats will be deployed to warn other craft in the vicinity of the working area.
Craft involved in the works will exhibit the appropriate local and international day and night signals.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear and not to enter the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and navigate with caution;
d) Maintain a listening watch on VHF Channel 12 (East Control);
and
e) Communicate with East Control on VHF Channel 12 for assistance, if required.
For information about operations in Singapore contact GAC Singapore at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.