04 Dec 2019 / Singapore
From 4 December 2019 to 30 April 2020, work to install a floating sea barrier will be carried out at Selat Sengkir.
According to the Maritime and Port Authority of Singapore Port Marine Notice No.125 of 2019, the work will be conducted 24 hours daily - including Sundays and Public Holidays - within the working area bounded by the following co-ordinates (WGS 84 Datum):
1) 01 deg. 15·415'N / 103 deg. 50·443'E
2) 01 deg. 15·240'N / 103 deg. 50·508'E
3) 01 deg. 15·263'N / 103 deg. 50·307'E
4) 01 deg. 15·209'N / 103 deg. 50·233'E
5) 01 deg. 15·291'N / 103 deg. 50·193'E
Installation of floating sea barrier will be carried out using crane and work barges. These barges will be assisted by tugs.
Safety boats will be deployed to warn other craft in the vicinity of the working area.
Craft involved in the works will exhibit the appropriate local and international day and night signals.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear and not to enter the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and navigate with caution;
d) Maintain a listening watch on VHF Channel 18 (Keppel Control);
and
e) Communicate with Keppel Control on VHF Channel 18 for assistance, if required.
For information about operations in Singapore contact GAC Singapore at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.