23 Dec 2015 / Hong Kong
From 30 December 2015 for approximately one week, underwater CCTV inspection of the Eastern Harbour Crossing’s cathodic protection system will be carried out within the area bounded by straight lines joining the following co-ordinates and the adjacent shoreline (WGS 84 Datum):
According to Marine Department Notice No. 177 of 2015 dated 23 December 2015, the work will be carried out between 0800 and 1800 – excluding Sundays and Public Holidays – along the line joining the following co-ordinates:
1) 22 deg. 17.902’N / 114 deg. 13.785’E
2) 22 deg. 17.881’N / 114 deg. 13.748’E
3) 22 deg. 17.916’N / 114 deg. 13.727’E
4) 22 deg. 17.923’N / 114 deg. 13.742’E
The works will involve diving operations from time to time using the abutting seawall as the base of operation.
One guard boat will provide assistance. The guard boat employed for the works will not stay in the works area outside the hours of work. The guard boat engaged in the works will display signals as prescribed in international and local regulations.
With divers working in the area, vessels navigating in the vicinity should proceed with caution and keep clear at slow speed.
For information about operations in Hong Kong contact GAC Hong Kong at gac.com/hongkong.
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.