26 Sep 2019 / Singapore

Injector trial runs south of Tuas View Extension

Injector trials will be conducted south of Tuas View Extension from 28 September 2019 to 28 March 2020.

According to the Maritime and Port Authority of Singapore Port Marine Notice No.091 of 2019, the trials will be conducted between 0700 and 1800 hours daily, including Sundays and Public Holidays, within the working area bounded by the following co-ordinates (WGS 84 Datum):
1) 01 deg. 12.830'N / 103 deg. 36.989'E
2) 01 deg. 12.820'N / 103 deg. 37.031’E
3) 01 deg. 12.667'N / 103 deg. 36.997’E
4) 01 deg. 12.678’N / 103 deg. 36.955’E

Craft involved in the trials will exhibit the appropriate local and international day and night signals.

The work involves injector trial runs by the cable laying barge for survey of seabed prior to the proposed trenching operations. Safety boats will be deployed in the vicinity of the working area to warn other vessels of the work.

When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear of the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and to navigate with caution;
d) Maintain a listening watch on VHF Channel 22 (Jurong Control);
and
e) Communicate with Jurong Control on VHF Channel 22 for assistance, if required.

For information about operations in Singapore, contact GAC Singapore at [email protected]

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.

Make an
enquiry

enquiry icon

Find your
country

country icon