31 Jul 2019 / Hong Kong
From 1 August and for approximately 2 weeks, hydrographic sounding survey will be carried out in the following areas:
WORKS AREA 1:
This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D):
(A) 22 deg. 17.584’N / 114 deg. 09.001’E
(B) 22 deg. 17.566’N / 114 deg. 09.023’E
(C) 22 deg. 17.447’N / 114 deg. 08.914’E
(D) 22 deg. 17.464’N / 114 deg. 08.892’E
WORKS AREA 2:
This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (E) to (K) and the adjacent shorelines:
(E) 22 deg. 17.395’N / 114 deg. 08.877’E
(F) 22 deg. 17.449’N / 114 deg. 08.893’E
(G) 22 deg. 17.402’N / 114 deg. 09.081’E
(H) 22 deg. 17.388’N / 114 deg. 09.080’E
(I) 22 deg. 17.354’N / 114 deg. 09.070’E
(J) 22 deg. 17.338’N / 114 deg. 09.066’E
(K) 22 deg. 17.304’N / 114 deg. 09.056’E
The works will be carried out by one work boat.
The hours of work will be from 0001 to 0500 hours. No works will be carried out on Sundays and public holidays. The work boat will not stay in the works areas outside the hours of work.
Vessel engaged in the operation will display signals as prescribed in international and local regulations.
Vessels navigating in the vicinity should proceed with caution and at slow speed.
(For information about operations in Hong Kong, contact GAC Hong Kong at [email protected])
Source: Government of the Hong Kong SAR Marine Department Notice No.123 of 2019
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.