31 Jul 2015 / Brazil, Rio De Janeiro
Port Authorities at Rio de Janeiro are preparing to introduce new procedures for the upcoming Olympic Sailing event to be held in the south and east side of Guanabara Bay in July and August. Sailing teams from around the world will take part and the Brazilian Olympic Committee expecting over 450 craft will participate. Guanabara Bay will be closed for all type of navigation between 11am up to 5pm for both the first stage (28 July-2 August) and the second stage of the event (2-9 August). During the period of the event: - No special authorisations will be granted; - The anchorage of platforms and similar will not be authorised from July; - No authorisation will be issued for vessels to drop anchor at the Inner Anchorage (south side of the bridge) between 28 July and 9 August; - If the sailing competitions finish ahead of schedule, the Maritime Authority may release the Guanabara Bay Navigation Channel; - There will be 15 alternative anchorage �reas at the Outer Anchorage. The Maritime Authority will guide vessels to the respective areas; - The Port Authority and Pilots will decide the sequence of incoming/outgoing maneuvers at Guanabara Bay; - Local navigation at north side of the bridge shall not be affected. Further instructions will be provided by the local Harbour Master in due course. For information about operations in Brazil contact GAC Brazil at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.