You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
31 Jul 2015 / Panama, Panama Canal
The installation of gates for the new locks of the Panama Canal have successfully begun on the Atlantic side of the waterway. The steel gates are moved using self-propelled motorized wheel transporters (SPMTs) with more than 400n wheels each. The first gate is positioned in local head two in the new locks on the Atlantic side and is 10 metres wide, 30.19 in height and weighs 3,285 tons, IN total the new locks will have 16 rolling gates, eight in the Pacific and eight in the Atlantic. Overall, the Panama Canal Expansion Program is 84% complete. (For information about operations in the Panama Canal contact GAC-Wilford & McKay at [email protected]) Source: Extract from Panama Canal Authority Advisory to Shipping No.A-01-2015