18 May 2018 / Singapore

Foreshore development with infilling works

The working period for foreshore development with infilling works off Harbour Front, Cruise Bay, has been extended.

According to the Maritime and Port Authority of Singapore Port Marine Notice No.50 of 2018, the work will now be carried out 24 hours daily – including Sundays & Public Holidays – from 23 May to 22 November within the working area bounded by the following coordinates (WGS 84 Datum):
1. 01 deg. 15.858’N / 103 deg. 49.059’E
2. 01 deg. 15.847’N / 103 deg. 49.174’E
3. 01 deg. 15.794’N / 103 deg. 49.174’E
4. 01 deg. 15.795’N / 103 deg. 49.042’E
5. 01 deg. 15.765’N / 103 deg. 49.172’E
6. 01 deg. 15.784’N / 103 deg. 49.030’E
7. 01 deg. 15.815’N / 103 deg. 49.042’E

Foreshore development with infilling works include removal of existing jetties, deck and dolphin structures, piling and construction of seawall. A safety boat will be deployed in the vicinity of the working area to warn other craft of the project.

Craft involved in the works will exhibit the appropriate local and international day and night signals.

When in the vicinity of the working area, mariners are reminded to:
a) keep well clear and not enter the working area
b) maintain a proper lookout
c) proceed at a safe speed and navigate with caution
d) maintain a listening watch on VHF Channel 05 (Cruise Bay Control)
and
e) communicate with Cruise Bay Control on VHF Channel 05 for assistance, if required.

For information about operations in Singapore contact GAC Singapore at [email protected]

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.

Make an
enquiry

enquiry icon

Find your
country

country icon