16 Sep 2015 / Acu, Brazil
The first vessel has called at the newly opened T-Mult (Terminal Multicargas) terminal at the port of Acu.
The vessel Turquoise Ocean will be loaded with 30.000 kg of bauxite and will sail to China in the coming days.
In 2014 over 480 million BRL (approx. US$ 125 million) was investments in the port in the state of Rio de Janeiro.
For information about operations in Brazil contact GAC Brazil at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.