25 Mar 2021 / Mangalore, India
Mangalore Port berthed their first Capesize vessel at Berth No. 16 yesterday (24 March 2021.
The vessel, MV Cape Keystone, arrived at New Mangalore at 2200 hours on 23 March and came alongside at Berth No. 16 at 0718 hours on 24 March to discharge 52014 MT coking coal.
Mangalore Coal Terminal advises that henceforth Capesize vessels can be accepted at Berth no.16 subject to arriving cargo being stowed in hold Nos. 1 to 7 due to the shore mechanical unloaders outreach being limited to these holds.
The Port authorities have informed Capesize vessels will be accepted provided the arrival draft is below 13.50 m and inward/outward movements are done only during daylight hours. Currently, the maximum LOA acceptable at this berth is upto 293 m.
(For information about operations in India, contact GAC India at [email protected])
You are currently on GAC Worldwide website.
GAC Netherlands Rotterdam Main Office Mercuriusstraat 44
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
GAC Netherlands Rotterdam Main Office Mercuriusstraat 44
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.