07 Sep 2016 / Hong Kong
With immediate effect and for a period of approximately 10 months, fender pile replacing works will be carried out at North Point Vehicular Ferry Pier. The works will be carried out within the area bounded by straight lines joining the following coordinates from (A) to (D):
(A) 22º 17.709’ N / 114º 12.208’ E
(B) 22º 17.672’ N / 114º 12.211’ E
(C) 22º 17.670’ N / 114º 12.182’ E
(D) 22º 17.708’ N / 114º 12.179’ E
The works will be carried out by a crane barge. A working area of approximately 15 metres around the barge will be established. The hours of work will be from 0800 hours to 1800 hours. No works will be carried out on Sundays and Public Holidays. The vessel employed for the works will not stay in the works area outside of the hours of work.
The vessel engaged in the operations will display signals as prescribed in international and local regulations.
Vessels navigating in the vicinity should proceed with caution.
For information about operations in Hong Kong contact GAC Hong Kong at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.