22 Mar 2018 / Singapore
The working period for dredging works off Sultan Shoal Lighthouse have been extended. The works are now being carried out 24 hours daily – including Sundays & Public Holidays – until 30 June.
According to the Maritime & Port Authority of Singapore’s Port Marine Notice No.029 of 2018, the work is being conducted within the working area bounded by the following coordinates:
1. 1 deg. 14.464’N / 103 deg. 38.946’E
2. 1 deg. 14.548’N / 103 deg. 39.133’E
3. 1 deg. 14.290’N / 103 deg. 39.254’E
4. 1 deg. 14.208’N / 103 deg. 39.043’E
Dredging works are being carried out by grab dredger, supported by hopper barges and pushed tugs. The grab dredger will be held in position by spuds – systems within the area.
The safety zone is a circular area of 250m radius centred at the dredger.
A safety boat will be deployed to warn other craft in the vicinity of the working area.
Craft involved in the works will exhibit the appropriate local and international day and night signals.
When in the vicinity of the working area, mariners are reminded to:
a) keep clear of the working area
b) maintain a proper lookout
c) proceed at a safe speed and navigate with caution
d) maintain a listening watch on VHF Channel 22 (Jurong Control), and
e) communicate with Jurong Control on VHF Channel 22 for assistance, if required.
For information about operations in Singapore contact GAC Singapore at [email protected]
You are currently on GAC Worldwide website.
GAC Netherlands Rotterdam Main Office Mercuriusstraat 44
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
GAC Netherlands Rotterdam Main Office Mercuriusstraat 44
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.