31 Jul 2015 / Hong Kong, Hong Kong

Dredging operations off Kai Tak Cruise Terminal

For approximately ten months, dredging operations will be carried out [off Kai Tak Cruise Terminal] within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (J): (A) 22 deg. 18.496'N / 114 deg. 12.463'E (B) 22 deg. 18.395'N / 114 deg. 12.575'E (C) 22 deg. 18.299'N / 114 deg. 12.675'E (D) 22 deg. 18.154'N / 114 deg. 12.661'E (E) 22 deg. 18.010'N / 114 deg. 12.647'E (F) 22 deg. 18.057'N / 114 deg. 12.530'E (G) 22 deg. 18.092'N / 114 deg. 12.568'E (H) 22 deg. 18.225'N / 114 deg. 12.576'E (I) 22 deg. 18.266'N / 114 deg. 12.579'E (J) 22 deg. 18.422'N / 114 deg. 12.394'E The works will be carried out by a flotilla of vessels including one grab dredger, four hopper barges, one derrick lighter, three tug boats and one survey boat. The number of vessels engaged in the works will change from time to time to suit operational requirements. A working area of approximately 50 metres around the dredger will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the dredger. The hours of work will be from 0700 to 2300 hours. Vessels engaged in the works will stay in the works area outside the hours of work. Silt curtains, extending from the sea surface to the seabed, will be established in the works area. The silt curtain is a large piece of netting used to contain mud and sediment. Vessels engaged in the operations will display signals as prescribed in international and local regulations. Vessels navigating in the vicinity should proceed with caution. (For information about operations in Hong Kong contact GAC Hong Kong at [email protected]) Source: Government of Hong Kong SAR Marine Department Notice No.81 of 2015

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.

Make an
enquiry

enquiry icon

Find your
country

country icon