You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
18 Apr 2018 / Hong Kong
For approximately 8 months, dredging operations will be carried out in the Tuen Mun River Channel within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (B), and from (C) to (D) and the adjacent shorelines:
(A) 22 deg. 23.023’N / 113 deg. 58.031’E
(B) 22 deg. 23.008’N / 113 deg. 58.083’E
(C) 22 deg. 22.716’N / 113 deg. 58.170’E
(D) 22 deg. 22.687’N / 113 deg. 58.101’E
The works will be carried out by a flotilla of vessels including two bucket pontoons, one backhoe pontoon, one derrick lighter and one split hopper barge. One tug boat and one work boat will provide assistance. The number of vessels engaged in the works will change from time to time to suit operational requirements.
The dredged materials will be conveyed to a split hopper barge anchored within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (E) to (H):
TRANSHIPMENT AREA:
(E) 22 deg. 22.532’N / 113 deg. 58.319’E
(F) 22 deg. 22.499’N / 113 deg. 58.339’E
(G) 22 deg. 22.483’N / 113 deg. 58.301’E
(H) 22 deg. 22.517’N / 113 deg. 58.283’E
Transhipment of dredged materials will take place in this area. A bucket pontoon assisted by a tug will deliver the dredged materials to the split hopper barge from time to time.
A working area of approximately 15 metres will be established around each backhoe pontoon and the derrick lighter. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from these vessels.
The hours of work will be from 0800 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works areas and the transshipment area outside the hours of works.
Vessels engaged in the operations will display signals as prescribed in international and local regulations.
Vessels navigating in the vicinity should proceed with caution.
(For information about operations in Hong Kong contact GAC Hong Kong at [email protected])
Source: Government of the Hong Kong SAR Marine Department Notice No.49 of 2018