10 Nov 2015 / Hong Kong

Dredging Operations in Nim Wan, Deep Bay

For approximately 5 months, dredging operations will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS84 Datum) from (A) to (I) and the adjacent shoreline:
(A) 22 deg. 25.438’N / 113 deg. 55.764’E
(B) 22 deg. 25.430’N / 113 deg. 55.671’E
(C) 22 deg. 25.506’N / 113 deg. 55.645’E
(D) 22 deg. 25.560’N / 113 deg. 55.816’E
(E) 22 deg. 25.550’N / 113 deg. 55.951’E
(F) 22 deg. 25.605’N / 113 deg. 56.111’E
(G) 22 deg. 25.639’N / 113 deg. 56.098’E
(H) 22 deg. 25.668’N / 113 deg. 56.197’E
(I) 22 deg. 25.599’N / 113 deg. 56.230’E

The works will be carried out by one grab dredger and one derrick lighter. Two hopper barges, some tugs and some work boats will provide assistance. The number of vessels engaged in the works will change from time to time to suit operational requirements.

A working area of approximately 60 metres around each working vessel will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels.

The hours of work will be round-the-clock.

A silt curtain will be established within the works area. The silt curtain is a large piece of netting used to contain mud and sediments.

Vessels engaged in the operations will display signals as prescribed in international and local regulations.

Vessels navigating in the vicinity should proceed with caution.

(For information about operations in Hong Kong contact GAC Hong Kong at [email protected])

Source: Government of Hong Kong SAR Marine Department Notice No.157 of 2015

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.

Make an
enquiry

enquiry icon

Find your
country

country icon