03 Sep 2019 / Singapore

Dredging off Sultan Shoal Lighthouse

The working period for dredging works off Sultan Shoal Lighthouse has been extended. The works are now being carried out until 29 February 2020.

According to the Maritime and Port Authority of Singapore Port Marine Notice No.082 of 2019, the works will carried out 24 hours daily - including Sundays & Public Holidays - within the working area bounded by the following coordinates (WGS 84 Datum):
1) 1 deg. 14.476’N / 103 deg. 38.969’E
2) 1 deg. 14.544’N / 103 deg. 39.135’E
3) 1 deg. 13.760’N / 103 deg. 39.502’E
4) 1 deg. 13.127’N / 103 deg. 39.482’E

Dredging works will be carried out by grab dredgers, supported by hopper barges and pusher tugs. The grab dredgers will be held in position by spuds systems within the working area.

The safety zone is a circular area of 250m radius centred at the dredger.

A safety boat will be deployed to warn other craft in the vicinity of the working area.

Craft involved in the works exhibit the appropriate local and international day and night signals.

When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear of the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and to navigate with caution;
d) Maintain a listening watch on VHF Channel 22 (Jurong Control);
and
e) Communicate with Jurong Control on VHF Channel 22 for assistance, if required.

For information about operations in Singapore contact GAC Singapore at [email protected]

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.

Make an
enquiry

enquiry icon

Find your
country

country icon