02 Nov 2017 / Hong Kong
For approximately 4 months, dredging operations will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (F) and the adjacent shoreline:
(A) 22 deg. 19.703’N / 114 deg. 07.603’E
(B) 22 deg. 19 .651’N / 114 deg. 07.621’E
(C) 22 deg. 19.635’N / 114 deg. 07.565’E
(D) 22 deg. 20.167’N / 114 deg. 07.384’E
(E) 22 deg. 20.183’N / 114 deg. 07.440’E
(F) 22 deg. 20.132’N / 114 deg. 07.457’E
The works will be carried out by a grab dredger. Three tugboats and three split hopper barges will assist in the works. The number of vessels engaged in the works will change from time to time to suit operational requirements.
A working area of approximately 50 metres around the grab dredger will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the grab dredger.
The hours of works will be round-the-clock.
Vessels engaged in the operations will display signals as prescribed in international and local regulations.
Vessels navigating in the vicinity should proceed with caution.
(For information about operations in Hong Kong contact GAC Hong Kong at [email protected])
Source: Government of the Hong Kong SAR Marine Department Notice No.152 of 2017 dated 31 October 2017
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.