You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
16 Aug 2018 / Port Arthur, United States
Based on a US Army Corps of Engineers channel survey dated 4 June 2018 and the Sabine Pilot’s recommendation, VTS Port Arthur implements the following draft restrictions for the Port Arthur East Turning Basin due to shoaling:
1) For vessels transiting to/from Motiva berth 2: maximum draft shall not exceed 11.3m (37 feet).
2) For vessels transiting to/from Motiva berths 6 & 7: maximum draft shall not exceed 11,0m (36 feet).
3) For vessels transiting to/from the PABFACS berth: maximum draft shall not exceed 11.0m (36 feet).
This notice will be posted on the Coast Guard’s HOMEPORT website at http://homeport.uscg.mil and the VTS website at https://www.atlanticarea.uscg.mil/vtsportarthur/.
(For information about operations in the United States contact GAC North America at [email protected])
Source: U.S. Coast Guard Marine Safety Unit, Port Arthur, Texas, Marine Safety Information Bulletin 07-18 dated 15 August 2018