31 Jul 2015 / India, Mundra
Mundra Port Authorities have advised changes to the draft at berths and minimum depths at approach channel and turning circle for the month of July 2014. a) Minimum depth in the MICT container approach channel and turning circle is 13.5 mtrs. at Chart Datum. b) Minimum depth in the South basin approach channel and turning circle is 14.5 mtrs. at Chart Datum. c) Minimum depth in the West Basin approach channel 14.3 mtrs.at Chart Datum. Berth B-1 - Draft 14.0 m Berth B-2 - Draft 13.0 m Berth B-3 - Draft 14.0 m Berth B-4 - Draft 13.6 m Berth B-5 - Draft 14.0 m Berth B-6 - Draft 16.0 m Berth B-7 - Draft 12.0 m Berth B-8 - Draft 10.5 m Berth B-9 - Draft 12.8 m Berth B-10 - Draft 13.6 m WB-1 - Draft 17.5 m WB-2 - Draft 17.3 m WB-3 - Draft 17.3 m MICT CB1 - Draft 13.7 m MICT CB2 - Draft 14.4 m (Only up to bollard 32) AMCT CB3 - Draft 13.9 m AMCT CB4 - Draft 14.0 m (Only up to bollard 31) SB-6 - Draft 15.0 m SB-7 - Draft 15.0 m For information about operations in India contact GAC India at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.