31 Jul 2015 / Australia, Dampier
The Port of Dampier is at Cyclone Response Stage 3 � Clear Port, and is commencing to clear the port and anchorages of all large vessels 12 hours ahead of the anticipated onset of gale force winds. The Harbour Master has directed that Masters should ensure that: * Engines and machinery are fully operational; * Vessel stability, trim, and propeller immersion are appropriate; * Manning, stores and bunkers are adequate; to enable large vessels to put to sea at short notice or small vessels to move onto their designated cyclone moorings at short notice. All Dampier anchorages are closed to new arrivals, with the exception of vessels proceeding to their designated cyclone moorings and small vessels seeking safe haven. The Port of Dampier may be closed at some stage tomorrow. Further updates will be broadcast, as required, but by the latest 1000 hours local time on 12 March. The latest Bureau of Meteorology cyclone forecast issued 0900 local time today (11 March) advises that the low continues to show signs of steady intensification and is on track to reach tropical cyclone intensity later today. The system is moving on a south-south westerly track, and is expected to continue to steer on a south to southwest track over the next 48 hours indicating a passage close to the NW Cape region on Friday morning. Based on the current track the system is likely to produce gales in the NW Shelf area off the Pilbara coast from tomorrow morning (12 March). For information about operations in Australia contact GAC Australia at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.