26 Aug 2021 / Hong Kong, SAR
With immediate effect and for a period of approximately five weeks, construction of subsea pipeline will be carried out at Urmston Road along the following coordinates (WGS 84 Datum) from (A) to (H):
(A) 22° 25.170’N 113° 54.471’E
(B) 22° 25.326’N 113° 53.983’E
(C) 22° 25.282’N 113° 53.504’E
(D) 22° 25.150’N 113° 53.056’E
(E) 22° 24.925’N 113° 52.631’E
(F) 22° 24.557’N 113° 52.342’E
(G) 22° 24.111’N 113° 52.242’E
(H) 22° 23.337’N 113° 52.246’E
The works will be carried out by two special purpose vessels. One tugboat and four guard boats will provide assistance.
A working area of approximately 600 metres around each special purpose vessel will be established. Yellow marker buoys fitted with yellow flashing lights and radar reflectors will be laid to mark the positions of the anchors extending from the special purpose vessels.
Between the coordinates (C) and (E), a passageway with a minimum width of 340 metres for vessels to pass through the works area will be maintained. Guard boats will be stationed at the passageway to give necessary assistance.
The works will be carried out round-the-clock.
Vessels engaged in the operations will display signals as prescribed in international and local regulations.
(For information about operations in Hong Kong, contact GAC Hong Kong at [email protected] )
Source: Government of the Hong Kong SAR Marine Department Notice No.145/2021
You are currently on GAC Worldwide website.
GAC Netherlands Rotterdam Main Office Mercuriusstraat 44
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
GAC Netherlands Rotterdam Main Office Mercuriusstraat 44
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.