31 Jul 2015 / Singapore, Singapore

Construction of silt barricade at Tuas Power Intake

From 10 November 2014 to 19 January 2015, work will be carried out on the construction of a silt barricade off Tuas Power Station, within the working area bounded by the following co-ordinates (WGS 84 Datum): 1) 1� 16.752'N / 103� 38.420'E 2) 1� 16.751'N / 103� 38.442'E 3) 1� 16.724'N / 103� 38.440'E 4) 1� 16.721'N / 103� 38.473'E 5) 1� 16.729'N / 103� 38.474'E 6) 1� 16.724'N / 103� 38.547'E 7) 1� 16.628'N / 103� 38.539'E 8) 1� 16.639'N / 103� 38.412'E According to the Maritime and Port Authority of Singapore Port Marine Notice No. 136 of 2014 dated 6 November 2014, the works will be carried out 24 hours daily including Sundays and Public Holidays. The construction of the silt barricade will entail piling work using crane barge with vibro hammer and guide frame. Material barges will be used to hold logistic equipment. Craft involved in the works will exhibit the appropriate local and international day and night signals. When in the vicinity of the working area, mariners are reminded to: (a) keep well clear and not to enter the working area; (b) maintain a proper lookout; (c) proceed at a safe speed & navigate with caution; (d) maintain a listening watch on VHF Channel 22 (Jurong Control); and (e) communicate with Jurong Control on VHF Channel 22 for assistance, if required. For information about operations in Singapore contact GAC Singapore at [email protected]

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.

Make an
enquiry

enquiry icon

Find your
country

country icon