You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
30 Oct 2019 / Marina Bay, Singapore
Date: With effect from 01 Nov 2019 to 30 Apr 2020
Location: Off Marina Bay Cruise Centre, within the working area bounded by the following coordinates.
(WGS 84 Datum)
Point 1
Latitude (N) 01°15.841'
Longitude (E) 103°51.693'
Point 2
Latitude 01°15.887'
Longitude 103°51·660'
Point 3
Latitude 01°15·913'
Longitude 103°51·697'
Point 4
Latitude 01°15·875'
Longitude 103°51.724'
Working Hours: 0800 hours to 2200 hours daily including weekends and Public Holidays.
Craft MTC 5
Harbour Craft Licence No. SR 3786I
Description: Crane Barge
Craft MTC 2
Harbour Craft Licence No. SR 3554H
Description: Work Barge
Craft: POE 1829
Harbour Craft Licence No. SR 3103H
Description: Crane Barge
Craft: MTC TIGA
Harbour Craft Licence No. SR 3589J
Description: Passenger/Safety Boat
Craft: STK 3
Harbour Craft Licence No. ST 1396G
Description: Tug Boat
Craft: STK 5
Harbour Craft Licence No. ST 1412B
Description: Tug Boat
Craft: MAKO 9
Harbour Craft Licence No. ST 0914E
Description: Tug Boat
Craft: STK 7
Harbour Craft Licence No. ST 1585D
Description: Tug Boat
Craft: STK 13
Harbour Craft Licence No. ST 1156E
Description: Tug Boat
Craft: KMT VISTA
Harbour Craft Licence No. ST 1310Z
Description: Tug Boat
These craft will exhibit the appropriate local and international day and night signals.
Details
The construction works entail marine piling works, concrete reinforcement works and installation of floating pontoon.
Buoys will be installed to mark the working area.
A safety boat will be deployed in the vicinity to warn other craft about the work.
Caution
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear of the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and to navigate with caution;
d) Maintain a listening watch on VHF Channel 18 (Keppel Control);
and
e) Communicate with Keppel Control on VHF Channel 18 for assistance, if required
Source: Maritime and Port Authority of Singapore, Port Marine Notice No. 106 of 2019
For information about operations in Singapore contact GAC Singapore at [email protected]