16 Nov 2016 / Brisbane, Australia
On the evening of Sunday 13 November, the shiploader at the Queensland Bulk Handling coal terminal in Brisbane was damaged due to extreme weather.
The loader is currently inoperable. A preliminary assessment of the damaged indicated that it could take several weeks for it to be repaired.
As a result, during this time, the terminal will not be able to load coal onto ships.
For information about operations in Australia contact GAC Australia at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.