28 Nov 2017 / Lower Mississippi River, United States
The United States Army Corps of Engineers (USACE) is conducting mat sinking operations near the HPL Bridge at MM105.8, AHOP. There will be intermittent closures of the main navigation span of the HPL Bridge.
During the closures, all vessels must use the alternate navigation span. Additionally, all vessels will be restricted to one-way transit of the bridge.
The alternate navigation span has a vertical clearance of 144.0 feet less the Carrollton Gauge.
As of 0600 yesterday (27 November), the Carrollton Gauge read 5.36 feet. Therefore, the vertical clearance of the alternate span is 144.0 - 5.36 + 138.64 feet or 42.25 meters.
Effective dates and times of closures: November 27-28 from 0600 to 1900 hours local time.
For information about operations in the United States contact GAC USA at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.