10 Jul 2019 / Singapore
From 15 July to 15 November, civil and structural works will be carried out at Berth No.10 at Pulau Bukom.
According to the Maritime and Port Authority of Singapore Port Marine Notice No.063 of 2019 dated 9 July 2019, the works will be conducted 24 hours daily - including Sundays & Public Holidays - within the working area bounded by the following co-ordinates (WGS 84 Datum):
1) 01 deg. 13.670'N / 103 deg. 46.673'E
2) 01 deg. 13.692'N / 103 deg. 46.652'E
3) 01 deg. 13.715'N / 103 deg. 46.677'E
4) 01 deg. 13.616'N / 103 deg. 46.775'E
5) 01 deg. 13.590'N / 103 deg. 46·747'E
6) 01 deg. 13.655'N / 103 deg. 46.685'E
Civil and structural works will be carried out to strengthen existing Berth No.10 at Pulau Bukom. Safety boats will be deployed in the vicinity of the working area to warn other vessels of the work.
Craft involved in the works will exhibit the appropriate local and international day and night signals.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear of the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and to navigate with caution;
d) Maintain a listening watch on VHF Channel 22 (Jurong Control);
and
e) Communicate with Jurong Control on VHF Channel 22 for assistance, if required.
For information about operations in Singapore, contact GAC Singapore at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.