01 Jun 2017 / Hong Kong
For approximately 2 months, bulkhead removal works for seawater intake and outfall culverts will be carried out within the works area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline:
(A) 22º 18.047’ N / 114º 09.899’ E
(B) 22º 18.045’ N / 114º 09.900’ E
(C) 22º 18.039’ N / 114º 09.845’ E
(D) 22º 18.040’ N / 114º 09.844’ E
The works will involve diving operations from time to time using the abutting seawall as the base of operation. One guard boat will provide assistance.
The hours of work will be from 0800 to 1800 hours. No works will be carried out on Sundays and public holidays. The guard boat employed for the works will not stay in the works area outside the hours of work.
The guard boat engaged in the works will display signals as prescribed in international and local regulations.
Vessels navigating in the vicinity should proceed with caution.
(For information about operations in Hong Kong contact GAC Hong Kong at [email protected])
Source: Government of Hong Kong SAR Marine Department Notice No.78 of 2017
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.