03 Oct 2016 / Houston, TX, United States
Based on a hydrographic survey conducted by the Army Corps of Engineers on 9/28, Houston Pilots is imposing the following operational restriction for ships transiting in and out of Bayport.
Effective immediately, all vessels transiting to/from Bayport (sailings, arrivals, & shifts) with a draft greater than 35’ freshwater are required to have 2 tugs, at Pilots discretion. The tugs are to assist transiting vessels in safely making the turn into and out of the Bayport Ship Channel.
The shoaling in the south flare has not changed much since the last hydro survey (dated July 2016), with less than 40’ MLLW extending approximately 300’ north from Bayport Ship Channel B-3. However, the shoaling in the north flare continues to build. Minimum depth in the north flare is 36’ MLLW, with 2/3rds of the north flare at 37’ MLLW.
As dredging and surveying progresses in Bayport, Houston Pilots will look to modify or remove this restriction as soon as safely possible.
(For information about operations in the USA contact GAC USA at [email protected])
Source: Houston Pilots
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.