03 Dec 2018 / Singapore
The working period for works off Tuas View Extension has been extended and the working area revised.
According to the Maritime and Port Authority of Singapore Port Marine Notice No.120 of 2018 dated 3 December 2018, bulk carriers will be transiting the Sinki Fairway to the break-bulking slot “ATWJ1” as part of works for the transport of sand material to the stockpile area at Tuas View Extension.
The anchoring of vessels will take place during daylight hours between 0630hrs and 1900hrs. All vessels shall maintain a proper lookout, proceed at a safe speed and to navigate with caution when in the vicinity of the area.
For information about operations in Singapore contact GAC Singapore at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.