Anchoring of vessels off Tuas View Extension

13 Feb 2018 / Singapore

During the period [up to 25 June 2018], bulk carriers will be transiting the Sinki Fairway to the two break-bulking slots (i.e. ATWJ1 and ATWJ2)…

The anchoring of vessels will take place during daylight hours between 0630 hours and 1900 hours. All vessels shall maintain a proper lookout, proceed at a safe speed and to navigate with caution when in the vicinity of the area.

Any enquires relating to the mooring and unmooring operations can be directed to Mr Andrew Lee, Operation Manager at Tel: (65) 9777-7896 (email: [email protected]).

Please call Capt. Shawn Hoe at Tel: (65) 6773-7401 or Marine Safety Control Centre (MSCC) Duty Officer at (65) 6325-2488/2489 for clarifications on this Port Marine Notice.

(For information about operations in Singapore contact GAC Singapore at [email protected])

Source: Maritime and Port Authority of Singapore Port Marine Notice No.017 of 2018 dated 13 February 2018

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.